62b1db62568d10226b57e6d6 e12a545986e5d5ab7179939826fb46323ba92b7799f639707b283f8839f1ccb0 web

Location

Ashby de la Zouch, Leicestershire

Project summary

  • To obtain a change of use of the existing commercial building to D2 leisure use comprising an eco-gym, café and creche.
  • To overcome constraints including the site’s location within a commercial area protected for traditional business uses, drainage capacity due to it being within the catchment of the River Mease Special Area of Conservation and meeting parking requirements.

Solution

  • A Sequential Assessment was carried out, demonstrating no suitable alternative sites. The project would provide local jobs and provide an ancillary facility serving existing businesses on the wider employment site.
  • The River Mease constraints were overcome through calculations of the previous use compared to the proposed, there would not be a significant increase in flows to mains sewers, no adverse impact on the Special Area of Conservation.
  • Significant level of community support to deliver the project, bringing environmental and social benefits and an innovative facility that has not yet been achieved in this area.

Benefits

  • To inspire and improve the behaviour, attitudes and lives of the local community.
  • To deliver several key sustainability benefits to help deliver a commercial and community facility, reflecting the client’s strong health and wellbeing values.

More Case Studies

Top